Results

Disseminated Mineralized Rubble Results
Date
Sampled
Sample #
( Grab)
Cu
ppm
Au
ppb
Pt
ppb
Pd
ppb
Ni
ppm
Co
ppm
Fe
%
Mg
%
2000
DICM 10
6,417
571
76
135
377
65
5.2
6.5
2000
05-2000
5,667
540
67
220
395
78
5.7
6.9
2000
03-11-00-08
5,908
535
111
197
377
63
4.8
6.0
2001
I-1
7,170
759
120
189
409
72
5.4
6.2
2002
02-05-10
11,620
1011
127
348
565
90
6.8
8.2
2002
250576
6,257
642
113
167
287
45
4.2
3.9
2012
060687
7,779
739
237
141
540
106
8.4
13.2
2012
1R-10-7-12
6,645
772
159
190
380
65
5.6
7.4
Average
 
7,183
696
126
198
416
73
5.8
7.3


Massive Sulfide Drill Intercepts
Hole #
Description
Cu
ppm
Ni
ppm
Co
ppm
Pd+Pt
ppb
Fe
%
05-I-02 1.4 metres of massive sulfide (75.2-76.6 m).
6,635
299
1,349
33
47.5
05-I-03 17.0 metres of massive sulfide (32.9- 49.9 m; (60% MS interspersed with pyroxenite).
3,427
362
270
24
23.7
Incl. 1.4 metres of massive sulfide (47.8- 49.2 m).
9,525
927
1,298
5
55.7
05-I-04 Elevated Ni to 955 ppm (0.10% Ni) per 2.5 m sample (e.g. 23.0-25.5)
67
956
86
12
6.7
06-I-05 2.3 metres of massive sulfide assaying 0.54% Cu, 0.04% Co, 170 ppm Ni, (73.4- 75.7 m).
5,428
170
366
13
31.8
06-I-06 2.1 metres of massive sulfide (136.2- 138.4 m).
1,363
125
246
34
9.3
06-I-09 9.7 metres disseminated sulfide (129.6-139.3 m) (Elevated Bi averaging 22.3 ppm)
1,786
54
45
15
8.2

Home   Corporate   Projects   Investors   Qwikreport   Contact Us  

Cariboo Rose

Adnet Communications Inc.