 | 

|  | 


Previous. All pages. Next. 1. 2. 3. 4. 5. 6. 7. 8. Page 9. 10
| March 10, 2005 |
Iron Lake Exploration Plans |
| February 11, 2005 |
Massive Sulphides Intersected in Iron Lake Drilling |
| November 29, 2004 |
Copper Peak area discovery hole extends the Lorraine mineralizing system 900 metres south from the Upper Main Zone. Bishop Zone drilling opens the zone to the southeast |
| October 27, 2004 |
Castillian prepares to drill Indata porphyry copper-gold target |
| October 21, 2004 |
Drilling discoveries at Lorraine Deposit. System opens in all directions |
| September 30, 2004 |
High grade extended in Lower Main Zone of Lorraine copper-gold deposit |
| September 23, 2004 |
Eastfield graduates to Tier 1 status by the TSX Venture Exchange |
| September 22, 2004 |
Airborne survey completed at Iron Lake copper-palladium-gold project |
| August 04, 2004 |
Discoveries and new mineral zones at Lorraine/ Jajay project |
| June 21, 2004 |
Exploration begins at Lorraine |
Previous. All pages. Next. 1. 2. 3. 4. 5. 6. 7. 8. Page 9. 10 |  |